October 5, 2026
Telemetry-Driven Availability:
Raising Nines with Health-Aware Orchestration
SUMMARY
Cerbrec’s orchestration platform raises the availability of a Tier I Site Set and widens each site’s downtime budget, on top of what site count alone delivers. It does this with three levers:
- 01
Health telemetry
Outages the platform sees coming are moved into the daily demand trough, where they cost almost nothing. If half of outages are anticipated, each site can be down twice as long for the same availability.
- 02
Shared headroom
A tenant’s models share one pool of capacity. Their bursts rarely coincide, so the pool is overrun far less often than any single model’s capacity. This lowers the overload ceiling that no facility design can touch.
- 03
Controlled switching
Replicas move and rescale fast enough to follow demand, but not so often that switching becomes the cost.
This paper builds on Sizing Multi-Site Capacity with Loss-of-Load Probability and uses the same four demand profiles. Figures are illustrative until the inputs are measured on Cerbrec’s platform.
Background
Loss-of-Load Probability. A tenant’s capacity is spread across N Tier I sites, each down a fraction q of the time (about 0.33%). LOLP is how often the tenant’s demand D, as a share of its installed capacity, exceeds the capacity still running:
The approximation holds because one site down is far more likely than two. Two consequences follow: availability scales directly with q, and each site has a downtime budget, the most it can be down while the Site Set meets its target.
Demand. Demand is a daily baseline times random variation times occasional bursts. Four illustrative profiles, all averaging 30% utilization, run from a steady enterprise API to bursty agent traffic. Bursts can push demand above all installed capacity; that overload is reported separately from shortfalls caused by facility outages.
Response classes. Every site event is sorted into one of three classes by the monitoring platform, using a trigger table agreed with the tenant:
| Class | What triggers it | Response |
|---|---|---|
| R1 Emergency | Sudden events: fire alarm, water leak, loss of cooling, site on generator, site dark | Acknowledge in 15 min; on site in 1–2 hr urban, 3–4 hr rural; 24/7 |
| R2 Priority | Failures monitoring sees developing: battery string trending out of spec, cooling unit drawing abnormal current, generator failing its self-test | Acknowledge in 30–60 min; on site within 4 hr; 24/7 |
| R3 Scheduled | Failures already absorbed and planned work: single-server swaps, preventive maintenance, inspections | Next scheduled visit, within 5 business days |
R2 events and planned R3 work are what health telemetry sees coming; R1 events are the surprises.
Health telemetry: moving outages into the trough
An outage the platform sees coming can be timed for the daily demand trough, where it costs almost nothing. Cerbrec’s orchestration system tracks a health score for each rack and site: scheduled maintenance, cooling units drawing abnormal current, battery strings trending out of spec, a generator that failed its self-test. When a site is flagged, work is scheduled for the next low-demand window and replicas move to healthy sites first.
In the trough, demand almost never exceeds what the remaining sites carry. For typical inference on four sites, the chance demand is above 75% of capacity falls from about 0.2% across the whole day to about one in a million in the lowest quarter of the day. So if a share f of outages is anticipated, only the rest count:
The gain is the same as cutting site downtime by the share anticipated: about 0.3 nines at f = 50% and 0.6 nines at f = 75%. Put the other way, each site’s downtime budget grows by 1/(1 − f). Anticipating half of outages doubles it.
Facility-caused availability on Tier I sites, in nines, by share of outages anticipated:
| Demand profile | 4 sites, none anticipated | 4 sites, half | 4 sites, three-quarters | 5 sites, half |
|---|---|---|---|---|
| Steady enterprise API | 6.2 | 6.6 | 6.9 | 6.9 |
| Typical inference | 4.6 | 5.0 | 5.3 | 5.1 |
| Consumer app, strong daily cycle | 3.9 | 4.3 | 4.6 | 4.5 |
| Bursty agents and launches | 4.1 | 4.4 | 4.6 | 4.4 |
The Response-Class SLA gives a first estimate of f. At a 5 MW site the plan expects 16–20 R2 events against 12–14 R1 events a year, so roughly half of events arrive with warning. That counts events, not outage minutes, and an alert only helps if it comes far enough ahead to move replicas and wait for the trough.
Shared headroom: lowering the overload ceiling
Pooling a tenant’s models into one capacity pool cuts overload sharply, because their bursts rarely land at the same moment. Overload, demand above all installed capacity, caps availability in any facility; site design cannot raise that ceiling, but pooling can.
With M models each given capacity Cᵢ, separate capacity overloads whenever any one model exceeds its own share. A shared pool overloads only when the models together exceed the total:
The spread of combined demand grows more slowly than its total, so the same headroom covers more. For models of similar size, the buffer a shared pool needs relative to separate buffers is:
where ρ measures how closely the models’ demand moves together. Four unrelated models need half the buffer; four closely linked ones (ρ = 0.5) need about 80%.
Overload ceiling in nines, by number of models sharing one pool. All models follow the same daily cycle; their random variation and bursts are independent:
| Demand profile | 1 model | 2 models | 4 models | 8 models |
|---|---|---|---|---|
| Steady enterprise API | 6.4 | 11.0 | above 12 | above 12 |
| Typical inference | 3.4 | 4.9 | 7.9 | above 12 |
| Consumer app, strong daily cycle | 2.9 | 3.6 | 5.3 | 8.5 |
| Bursty agents and launches | 2.2 | 2.7 | 3.9 | 5.9 |
For typical inference, pooling four models lifts the overload ceiling from 3.4 to 7.9 nines, so total availability is again set by facility outages rather than bursts. The gain depends on bursts being independent: a single launch that hits every model at once behaves like one model and removes the benefit.
Replica placement
A model degrades gracefully only as finely as its replicas are spread. Every failure removes a chunk of capacity: one replica costs 1/R of the model’s capacity, and one site costs every replica placed there, about 1/N. The worst step is the larger of the two, so replicas should be spread evenly across sites, and more replicas smooth out server failures but not site failures.
Replica size matters too. A replica spanning m servers is lost if any of them fails, so with servers each down a fraction p of the time:
At 98% per server, a one-server replica is up 98% of the time and an eight-server replica 85%. Where a model fits, smaller replicas give both more of them and more reliable ones.
Small models pay a rounding penalty. Replicas come in whole units. To keep serving peak demand with the largest site down, a model needing r replicas on N sites must deploy R with R − ⌈R/N⌉ ≥ r. On four sites:
| Replicas needed at peak | Replicas deployed | Extra |
|---|---|---|
| 1 | 2 | 100% |
| 2 | 3 | 50% |
| 3 | 4 | 33% |
| 10 | 14 | 40% |
| 50 | 67 | 34% |
Shared headroom offsets this: small, spiky models draw spare replicas from a common pool on compatible hardware instead of each carrying its own rounding overhead.
The cost of switching
Moving and rescaling replicas is never free, and the platform has to balance two costs: reacting too slowly and switching too often.
Reacting too slowly. A new replica takes time τ to start: loading model weights and warming caches. Demand keeps moving in the meantime, so each model needs a buffer that covers the drift over that gap. If demand drifts randomly, the buffer grows with the square root of start-up time:
Cutting start-up time by four times, for example by keeping model weights staged on local storage at every site, halves the buffer. Fast start-up also matters for telemetry: replicas have to finish moving before a flagged site goes down.
Switching too often. Rescaling on every small change wastes money on constant restarts. The platform instead waits until demand leaves a band of width b. A wider band means fewer switches but more idle replicas. With Cₛ the cost of one switch and c the cost of one idle replica for an hour, the cheapest band is:
The cube root means the band is forgiving: making switches eight times cheaper only halves it. Faster start-up therefore pays off mainly through a smaller buffer, not through fewer switches.
Response classes and operating cost
The downtime budget turns directly into how long each repair may take, and that sets dispatch urgency. A site’s unavailability is roughly its outages per year, λ, times the time to restore each one:
The (1 − f) term is telemetry’s contribution: anticipated outages are scheduled into the trough and barely draw on the budget, so only the surprises count against it.
This is where a Tier I site saves operating cost. With typical inference demand on five sites, each site’s budget for four nines is about 137 hours a year. A site with four outages a year can take about 34 hours to restore each one; if half are anticipated, about 68 hours. Events that a single-building design must treat as R1 emergencies can be handled as R2 or scheduled R3 work instead, with less on-site staffing and fewer local spares.
Servers follow the same logic at a finer grain. With typical demand, each server can be unavailable about 2.5% of the time, roughly 9 days a year, so a failed server can wait for the next scheduled R3 visit.
Putting it together
On typical inference demand, the three levers take a five-site Tier I set from about 3.4 nines of total availability to about 5.1, and double each site’s downtime budget.
| Step | Facility-caused | Total, including overload | Downtime budget per site (four nines) |
|---|---|---|---|
| Five Tier I sites alone | 4.8 | 3.4 | 137 h |
| Add health telemetry (half of outages anticipated) | 5.1 | 3.4 | 274 h |
| Add shared headroom (four models in one pool) | 5.1 | 5.1 | 274 h |
Availability in nines. Telemetry raises facility-caused availability but leaves total availability capped by overload; pooling removes that cap. Switching cost then sets the running overhead: with a 3-minute start-up and demand drifting by about 2 replicas an hour, the cheapest band is about 1.5 replicas, roughly 7 switches an hour and about one extra replica per model.
All three levers depend on figures still to be measured, listed below. For comparison, a single Tier III site delivers about 3.7 nines facility-caused and the same overload ceiling as the Tier I set.
Assumptions and open questions
The demand profiles are the four illustrative profiles from the sizing paper; outage counts per year are illustrative, and site failures are assumed independent. These figures firm up once five inputs are measured on Cerbrec’s platform:
- Share of outages anticipated (f). Measured from health-score alerts against actual site-down minutes, not event counts.
- Lead time. An alert only helps if it arrives before replicas can finish moving and the trough arrives. Alerts with less warning count as surprises.
- Outage duration. Scheduling into the trough assumes repairs fit within a low-demand window. Longer repairs spill into busier hours.
- Start-up time (τ). Time from scheduling a replica to serving traffic, per model size, with and without weights staged locally.
- Demand correlation between models (ρ). Taken from real tenant traces. Models serving the same product, time zone or launch are likely to burst together, which reduces the pooling gain.